Home / Asia / United Arab Emirates / Steel plants / Emsteel Abu Dhabi plant

Emsteel Abu Dhabi plant

Steel Plant in United Arab Emirates. Approximate location 24.32207, 54.46516.

Steel PlantUnited Arab EmiratesCO₂ reported

Emsteel Abu Dhabi plant is a steel plant in United Arab Emirates with a reported capacity of 3,600,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Emsteel Building Materials PJSC. By capacity it ranks #1 of 2 steel plants tracked in United Arab Emirates. It emits about 2,617,390 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 610,114 cars. Its CO₂ per unit of capacity is about 35% above the median steel plant.

3,600,000t of steel
2,617,390t CO₂e / yr (Climate TRACE)
#5CO₂ rank in United Arab Emirates
0.73t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566423.

Nel contesto: come si confronta questo impianto

Con 3,600,000 t of steel, Emsteel Abu Dhabi plant è attorno a la mediana di steel plant in United Arab Emirates (3,600,000 t of steel). Il suo CO₂ per unità di capacità è approssimativamente 52% al di sotto di la mediana di steel plant. Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 2,617,390 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

610,114cars driven for a year
341,339homes' annual energy use
43,623,167tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in United Arab Emirates

Emsteel Abu Dhabi plant: 3,600,000 t of steel3.6MEmsteel Ab…Arabian Gulf Steel Industries Abu Dhabi plant: 1,200,000 t of steel1.2MArabian Gu…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Emsteel Building Materials PJSC. All facilities by this operator →

Local climate

Emsteel Abu Dhabi plant sits in a hot desert climate zone (Köppen BWh), at 24.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 steel plants in United Arab Emirates by reported capacity.

Nearby industrial sites

Location

Coordinates 24.32207, 54.46516. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant is a steel plant in United Arab Emirates. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant has a reported capacity of 3,600,000 t of steel.

How much CO₂ does Emsteel Abu Dhabi plant emit?

Emsteel Abu Dhabi plant emits about 2,617,390 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 610,114 cars. That ranks #5 among tracked facilities in United Arab Emirates.

Where is Emsteel Abu Dhabi plant located?

Emsteel Abu Dhabi plant is in United Arab Emirates, near coordinates 24.32207, 54.46516.

Who operates Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant is operated by Emsteel Building Materials PJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.