Cement Plant in Egypt. Approximate location 29.74765, 32.21266.
Cement PlantEgyptCO₂ reported
El Sewedy Cement Attaka Plant is a cement plant in Egypt with a reported capacity of 3,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by El Sewedy Cement Co. By capacity it ranks #9 of 26 cement plants tracked in Egypt. It emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. Its CO₂ per unit of capacity is about 42% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896694.
Con 3,400,000 t of cement, El Sewedy Cement Attaka Plant è ben al di sopra di la mediana di cement plant in Egypt (2,690,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 41% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by El Sewedy Cement Co. All facilities by this operator →
El Sewedy Cement Attaka Plant sits in a hot desert climate zone (Köppen BWh), at 29.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #9 largest of 26 cement plants in Egypt by reported capacity.
Coordinates 29.74765, 32.21266. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

El Sewedy Cement Attaka Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.
El Sewedy Cement Attaka Plant has a reported capacity of 3,400,000 t of cement.
El Sewedy Cement Attaka Plant emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. That ranks #28 among tracked facilities in Egypt.
El Sewedy Cement Attaka Plant is in Egypt, near coordinates 29.74765, 32.21266.
El Sewedy Cement Attaka Plant is operated by El Sewedy Cement Co.