Cement Plant in Malaysia. Approximate location 1.36562, 110.34226.
Cement PlantMalaysiaCO₂ reported
CMS Cement Siburan Cement Plant is a cement plant in Malaysia with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cahya Mata Cement Sdn Bhd. By capacity it ranks #10 of 12 cement plants tracked in Malaysia. It emits about 372,320 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 86,788 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546767.
Con 1,000,000 t of cement, CMS Cement Siburan Cement Plant è al di sotto di la mediana di cement plant in Malaysia (2,300,000 t of cement). Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cahya Mata Cement Sdn Bhd. All facilities by this operator →
CMS Cement Siburan Cement Plant sits in a tropical rainforest climate zone (Köppen Af), at 1.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #10 largest of 12 cement plants in Malaysia by reported capacity.
Coordinates 1.36562, 110.34226. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

CMS Cement Siburan Cement Plant is a cement plant in Malaysia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
CMS Cement Siburan Cement Plant has a reported capacity of 1,000,000 t of cement.
CMS Cement Siburan Cement Plant emits about 372,320 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 86,788 cars. That ranks #30 among tracked facilities in Malaysia.
CMS Cement Siburan Cement Plant is in Malaysia, near coordinates 1.36562, 110.34226.
CMS Cement Siburan Cement Plant is operated by Cahya Mata Cement Sdn Bhd.