Home / South America / Venezuela / Cement plants / Cerro Azul Cement Plant

Cerro Azul Cement Plant

Cement Plant in Venezuela. Approximate location 9.98541, -63.3122.

Cement PlantVenezuelaCO₂ reported

Cerro Azul Cement Plant is a cement plant in Venezuela with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Corporacion Socialista del Cemento. By capacity it ranks #6 of 10 cement plants tracked in Venezuela. It emits about 307,164 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,600 cars. Its CO₂ per unit of capacity is about 15% below the median cement plant.

1,000,000t of cement
307,164t CO₂e / yr (Climate TRACE)
#14CO₂ rank in Venezuela
0.31t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1898065.

Nel contesto: come si confronta questo impianto

Con 1,000,000 t of cement, Cerro Azul Cement Plant è attorno a la mediana di cement plant in Venezuela (1,210,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 23% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 307,164 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

71,600cars driven for a year
40,058homes' annual energy use
5,119,400tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Venezuela

San Sebastian Cement Plant: 2,710,000 t of cement2.7MSan Sebast…Pertigalete Cement Plant: 2,680,000 t of cement2.7MPertigalet…Cumarebo Cement Plant: 1,590,000 t of cement1.6MCumarebo C…Monay Cement Plant: 1,350,000 t of cement1.4MMonay Ceme…Ocumare Cement Plant: 1,210,000 t of cement1.2MOcumare Ce…Cerro Azul Cement Plant: 1,000,000 t of cement1000kCerro Azul…Mara Cement Plant: 730,000 t of cement730kMara Cemen…Jardin de Venezuela Cement Plant: 650,000 t of cement650kJardin de …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Corporacion Socialista del Cemento. All facilities by this operator →

Local climate

Cerro Azul Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 10.0°N in the northern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 10 cement plants in Venezuela by reported capacity.

Location

Coordinates 9.98541, -63.3122. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Cerro Azul Cement Plant?

Cerro Azul Cement Plant is a cement plant in Venezuela. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Cerro Azul Cement Plant?

Cerro Azul Cement Plant has a reported capacity of 1,000,000 t of cement.

How much CO₂ does Cerro Azul Cement Plant emit?

Cerro Azul Cement Plant emits about 307,164 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,600 cars. That ranks #14 among tracked facilities in Venezuela.

Where is Cerro Azul Cement Plant located?

Cerro Azul Cement Plant is in Venezuela, near coordinates 9.98541, -63.3122.

Who operates Cerro Azul Cement Plant?

Cerro Azul Cement Plant is operated by Corporacion Socialista del Cemento.

Built from open public data; no personal information. Operate this site? Request a correction or removal.