Cement Plant in Albania. Approximate location 41.54885, 19.72631.
Cement PlantAlbaniaCO₂ reported
Borizane Cement Plant is a cement plant in Albania with a reported capacity of 1,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by ANTEA Cement ShA. By capacity it ranks #2 of 2 cement plants tracked in Albania. It emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437200.
Con 1,400,000 t of cement, Borizane Cement Plant è al di sotto di la mediana di cement plant in Albania (1,900,000 t of cement). Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by ANTEA Cement ShA. All facilities by this operator →
Borizane Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 41.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 cement plants in Albania by reported capacity.
Coordinates 41.54885, 19.72631. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Borizane Cement Plant is a cement plant in Albania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Borizane Cement Plant has a reported capacity of 1,400,000 t of cement.
Borizane Cement Plant emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. That ranks #2 among tracked facilities in Albania.
Borizane Cement Plant is in Albania, near coordinates 41.54885, 19.72631.
Borizane Cement Plant is operated by ANTEA Cement ShA.