Cement Plant in Russian Federation. Approximate location 44.79279, 37.69437.
Cement PlantRussian FederationCO₂ reported
Atakaycement Cement Plant is a cement plant in Russian Federation with a reported capacity of 450,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Atakaycement LLC. By capacity it ranks #49 of 53 cement plants tracked in Russian Federation. It emits about 142,001 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 33,100 cars. Its CO₂ per unit of capacity is about 12% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897728.
Con 450,000 t of cement, Atakaycement Cement Plant è al di sotto di la mediana di cement plant in Russian Federation (1,700,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 24% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Atakaycement LLC. All facilities by this operator →
Atakaycement Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 44.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #49 largest of 53 cement plants in Russian Federation by reported capacity.
Coordinates 44.79279, 37.69437. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Atakaycement Cement Plant is a cement plant in Russian Federation. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Atakaycement Cement Plant has a reported capacity of 450,000 t of cement.
Atakaycement Cement Plant emits about 142,001 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 33,100 cars. That ranks #158 among tracked facilities in Russian Federation.
Atakaycement Cement Plant is in Russian Federation, near coordinates 44.79279, 37.69437.
Atakaycement Cement Plant is operated by Atakaycement LLC.