Steel Plant in Türkiye. Approximate location 40.42728, 29.27012.
Steel PlantTürkiyeCO₂ reported
Asil Celik Orhangazi steel plant is a steel plant in Türkiye with a reported capacity of 730,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Asil Celik Sanayi ve Ticaret AŞ. By capacity it ranks #25 of 26 steel plants tracked in Türkiye. It emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567084.
Con 730,000 t of steel, Asil Celik Orhangazi steel plant è al di sotto di la mediana di steel plant in Türkiye (1,400,000 t of steel). Il suo CO₂ per unità di capacità è approssimativamente 45% al di sotto di la mediana di steel plant. Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Asil Celik Sanayi ve Ticaret AŞ. All facilities by this operator →
Asil Celik Orhangazi steel plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 40.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #25 largest of 26 steel plants in Türkiye by reported capacity.
Coordinates 40.42728, 29.27012. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Asil Celik Orhangazi steel plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Asil Celik Orhangazi steel plant has a reported capacity of 730,000 t of steel.
Asil Celik Orhangazi steel plant emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. That ranks #93 among tracked facilities in Türkiye.
Asil Celik Orhangazi steel plant is in Türkiye, near coordinates 40.42728, 29.27012.
Asil Celik Orhangazi steel plant is operated by Asil Celik Sanayi ve Ticaret AŞ.