Home / Europe / Greece / Cement plants / Aliveri Cement Plant

Aliveri Cement Plant

Cement Plant in Greece. Approximate location 38.37478, 24.06239.

Cement PlantGreeceCO₂ reported

Aliveri Cement Plant is a cement plant in Greece with a reported capacity of 3,300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Heracles General Cement Co. By capacity it ranks #2 of 6 cement plants tracked in Greece. It emits about 990,661 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 230,923 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.

3,300,000t of cement
990,661t CO₂e / yr (Climate TRACE)
#5CO₂ rank in Greece
0.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896841.

Nel contesto: come si confronta questo impianto

Con 3,300,000 t of cement, Aliveri Cement Plant è attorno a la mediana di cement plant in Greece (3,100,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 26% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 990,661 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

230,923cars driven for a year
129,194homes' annual energy use
16,511,017tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Greece

Agria Cement Plant: 4,000,000 t of cement4.0MAgria Ceme…Aliveri Cement Plant: 3,300,000 t of cement3.3MAliveri Ce…Magoula Cement Plant: 3,100,000 t of cement3.1MMagoula Ce…Pio Cement Plant: 1,900,000 t of cement1.9MPio Cement…Efkarpia Cement Plant: 1,130,000 t of cement1.1MEfkarpia C…Apropyrgos Cement Plant: 700,000 t of cement700kApropyrgos…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Heracles General Cement Co. All facilities by this operator →

Local climate

Aliveri Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 38.4°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 6 cement plants in Greece by reported capacity.

Nearby industrial sites

Location

Coordinates 38.37478, 24.06239. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Aliveri Cement Plant?

Aliveri Cement Plant is a cement plant in Greece. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Aliveri Cement Plant?

Aliveri Cement Plant has a reported capacity of 3,300,000 t of cement.

How much CO₂ does Aliveri Cement Plant emit?

Aliveri Cement Plant emits about 990,661 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 230,923 cars. That ranks #5 among tracked facilities in Greece.

Where is Aliveri Cement Plant located?

Aliveri Cement Plant is in Greece, near coordinates 38.37478, 24.06239.

Who operates Aliveri Cement Plant?

Aliveri Cement Plant is operated by Heracles General Cement Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.