Cement Plant in Egypt. Approximate location 28.29704, 30.85628.
Cement PlantEgyptCO₂ reported
Al Minya Desert Cement Plant is a cement plant in Egypt with a reported capacity of 2,690,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Royal El Minya Cement Co. By capacity it ranks #13 of 26 cement plants tracked in Egypt. It emits about 1,995,545 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 465,162 cars. Its CO₂ per unit of capacity is about 106% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896688.
Con 2,690,000 t of cement, Al Minya Desert Cement Plant è attorno a la mediana di cement plant in Egypt (2,690,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 107% al di sopra di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Royal El Minya Cement Co. All facilities by this operator →
Al Minya Desert Cement Plant sits in a hot desert climate zone (Köppen BWh), at 28.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #13 largest of 26 cement plants in Egypt by reported capacity.
Coordinates 28.29704, 30.85628. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Minya Desert Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Minya Desert Cement Plant has a reported capacity of 2,690,000 t of cement.
Al Minya Desert Cement Plant emits about 1,995,545 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 465,162 cars. That ranks #9 among tracked facilities in Egypt.
Al Minya Desert Cement Plant is in Egypt, near coordinates 28.29704, 30.85628.
Al Minya Desert Cement Plant is operated by Royal El Minya Cement Co.