Steel Plant in Egypt. Approximate location 31.11972, 29.80666.
Steel PlantEgyptCO₂ reported
Al-Ezz Dekheila Steel Alexandria plant is a steel plant in Egypt with a reported capacity of 3,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Al Ezz Dekheila Steel Company Alexandria SAE. By capacity it ranks #2 of 11 steel plants tracked in Egypt. It emits about 1,687,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 393,470 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566794.
Con 3,200,000 t of steel, Al-Ezz Dekheila Steel Alexandria plant è ben al di sopra di la mediana di steel plant in Egypt (1,200,000 t of steel). Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Al Ezz Dekheila Steel Company Alexandria SAE. All facilities by this operator →
Al-Ezz Dekheila Steel Alexandria plant sits in a hot desert climate zone (Köppen BWh), at 31.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 11 steel plants in Egypt by reported capacity.
Coordinates 31.11972, 29.80666. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al-Ezz Dekheila Steel Alexandria plant is a steel plant in Egypt. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Al-Ezz Dekheila Steel Alexandria plant has a reported capacity of 3,200,000 t of steel.
Al-Ezz Dekheila Steel Alexandria plant emits about 1,687,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 393,470 cars. That ranks #12 among tracked facilities in Egypt.
Al-Ezz Dekheila Steel Alexandria plant is in Egypt, near coordinates 31.11972, 29.80666.
Al-Ezz Dekheila Steel Alexandria plant is operated by Al Ezz Dekheila Steel Company Alexandria SAE.