Cement Plant in Poland. Approximate location 51.10966, 18.94393.
Cement PlantPolandCO₂ reported
Trebaczew Cement Plant is a cement plant in Poland with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementownia Warta SA. By capacity it ranks #4 of 10 cement plants tracked in Poland. It emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. Its CO₂ per unit of capacity is about 66% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439028.
À 2,000,000 t of cement, Trebaczew Cement Plant est autour de la médiane des cement plant en Poland (2,000,000 t of cement). Son CO₂ par unité de capacité est approximativement 113% au-dessus de la médiane des cement plant. Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cementownia Warta SA. All facilities by this operator →
Trebaczew Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 10 cement plants in Poland by reported capacity.
Coordinates 51.10966, 18.94393. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Trebaczew Cement Plant is a cement plant in Poland. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Trebaczew Cement Plant has a reported capacity of 2,000,000 t of cement.
Trebaczew Cement Plant emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. That ranks #5 among tracked facilities in Poland.
Trebaczew Cement Plant is in Poland, near coordinates 51.10966, 18.94393.
Trebaczew Cement Plant is operated by Cementownia Warta SA.