Cement Plant in Uganda. Approximate location 0.66041, 34.1568.
Cement PlantUgandaCO₂ reported
Tororo Cement Plant is a cement plant in Uganda with a reported capacity of 1,800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Tororo Cement Ltd. By capacity it ranks #1 of 2 cement plants tracked in Uganda. It emits about 722,073 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,315 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439238.
À 1,800,000 t of cement, Tororo Cement Plant est autour de la médiane des cement plant en Uganda (1,800,000 t of cement). Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Tororo Cement Ltd. All facilities by this operator →
Tororo Cement Plant sits in a tropical monsoon climate zone (Köppen Am), at 0.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 2 cement plants in Uganda by reported capacity.
Coordinates 0.66041, 34.1568. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Tororo Cement Plant is a cement plant in Uganda. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Tororo Cement Plant has a reported capacity of 1,800,000 t of cement.
Tororo Cement Plant emits about 722,073 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 168,315 cars. That ranks #1 among tracked facilities in Uganda.
Tororo Cement Plant is in Uganda, near coordinates 0.66041, 34.1568.
Tororo Cement Plant is operated by Tororo Cement Ltd.