Cement Plant in Germany. Approximate location 51.59858, 8.34965.
Cement PlantGermanyCO₂ reported
Thomas Erwitte Cement Plant is a cement plant in Germany with a reported capacity of 500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Thomas Zement GmbH & Co KG. By capacity it ranks #26 of 32 cement plants tracked in Germany. It emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546167.
À 500,000 t of cement, Thomas Erwitte Cement Plant est en dessous de la médiane des cement plant en Germany (1,000,000 t of cement). Son CO₂ par unité de capacité est approximativement 26% au-dessus de la médiane des cement plant. Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Thomas Zement GmbH & Co KG. All facilities by this operator →
Thomas Erwitte Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #26 largest of 32 cement plants in Germany by reported capacity.
Coordinates 51.59858, 8.34965. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Thomas Erwitte Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Thomas Erwitte Cement Plant has a reported capacity of 500,000 t of cement.
Thomas Erwitte Cement Plant emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. That ranks #68 among tracked facilities in Germany.
Thomas Erwitte Cement Plant is in Germany, near coordinates 51.59858, 8.34965.
Thomas Erwitte Cement Plant is operated by Thomas Zement GmbH & Co KG.