Cement Plant in Thailand. Approximate location 14.63006, 101.09896.
Cement PlantThailandCO₂ reported
Siam City Thap Kwang 2 Cement Plant is a cement plant in Thailand with a reported capacity of 4,645,143 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Siam City Cement PCL. By capacity it ranks #6 of 15 cement plants tracked in Thailand. It emits about 1,906,962 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 444,513 cars. Its CO₂ per unit of capacity is about 14% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547418.
À 4,645,143 t of cement, Siam City Thap Kwang 2 Cement Plant est bien au-dessus de la médiane des cement plant en Thailand (3,070,000 t of cement). Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Siam City Cement PCL. All facilities by this operator →
Siam City Thap Kwang 2 Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 14.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 15 cement plants in Thailand by reported capacity.
Coordinates 14.63006, 101.09896. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Siam City Thap Kwang 2 Cement Plant is a cement plant in Thailand. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Siam City Thap Kwang 2 Cement Plant has a reported capacity of 4,645,143 t of cement.
Siam City Thap Kwang 2 Cement Plant emits about 1,906,962 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 444,513 cars. That ranks #9 among tracked facilities in Thailand.
Siam City Thap Kwang 2 Cement Plant is in Thailand, near coordinates 14.63006, 101.09896.
Siam City Thap Kwang 2 Cement Plant is operated by Siam City Cement PCL.