Steel Plant in United Kingdom. Approximate location 51.47217, -3.15986.
Steel PlantUnited KingdomCO₂ reported
Se.ven GI Cardiff plant is a steel plant in United Kingdom with a reported capacity of 1,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Sev.en Global Investments AS. By capacity it ranks #5 of 6 steel plants tracked in United Kingdom. It emits about 38,019 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,862 cars. Its CO₂ per unit of capacity is about 94% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566827.
À 1,200,000 t of steel, Se.ven GI Cardiff plant est en dessous de la médiane des steel plant en United Kingdom (2,000,000 t of steel). Son CO₂ par unité de capacité est approximativement 70% en dessous de la médiane des steel plant. Sous-secteur: iron-and-steel. Comme steel plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1500°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les aciéries brûlent du charbon dans des hauts fourneaux ou utilisent des arcs électriques pour fondre des ferrailles; dans les deux cas, le métal en fusion doit être maintenu au-dessus de 1.500°C et transféré à travers des tuyauteries et récipients chauds étendus.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Sev.en Global Investments AS. All facilities by this operator →
Se.ven GI Cardiff plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 6 steel plants in United Kingdom by reported capacity.
Coordinates 51.47217, -3.15986. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Se.ven GI Cardiff plant is a steel plant in United Kingdom. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Se.ven GI Cardiff plant has a reported capacity of 1,200,000 t of steel.
Se.ven GI Cardiff plant emits about 38,019 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,862 cars. That ranks #40 among tracked facilities in United Kingdom.
Se.ven GI Cardiff plant is in United Kingdom, near coordinates 51.47217, -3.15986.
Se.ven GI Cardiff plant is operated by Sev.en Global Investments AS.