Cement Plant in Greece. Approximate location 38.33458, 21.84804.
Cement PlantGreeceCO₂ reported
Pio Cement Plant is a cement plant in Greece with a reported capacity of 1,900,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Titan Cement International SA. By capacity it ranks #4 of 6 cement plants tracked in Greece. It emits about 741,582 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 172,863 cars. Its CO₂ per unit of capacity is about 8% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896843.
À 1,900,000 t of cement, Pio Cement Plant est en dessous de la médiane des cement plant en Greece (3,100,000 t of cement). Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Titan Cement International SA. All facilities by this operator →
Pio Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 38.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 6 cement plants in Greece by reported capacity.
Coordinates 38.33458, 21.84804. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Pio Cement Plant is a cement plant in Greece. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Pio Cement Plant has a reported capacity of 1,900,000 t of cement.
Pio Cement Plant emits about 741,582 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 172,863 cars. That ranks #6 among tracked facilities in Greece.
Pio Cement Plant is in Greece, near coordinates 38.33458, 21.84804.
Pio Cement Plant is operated by Titan Cement International SA.