Home / Asia / Malaysia / Petrochemical plants / Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor

Petrochemical in Malaysia. Approximate location 1.37623, 104.16782.

PetrochemicalMalaysiaCO₂ reported

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor is a petrochemical in Malaysia with a reported capacity of 1,290,000 t of ethylene. It cracks hydrocarbon feedstocks into building-block chemicals such as ethylene and propylene. It is operated by Saudi Arabian Oil Co. By capacity it ranks #1 of 3 petrochemical plants tracked in Malaysia. It emits about 2,645,670 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 616,706 cars. Its CO₂ per unit of capacity is about 53% above the median petrochemical.

1,290,000t of ethylene
2,645,670t CO₂e / yr (Climate TRACE)
#3CO₂ rank in Malaysia
2.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-731963.

En contexte: comment cette installation se compare

À 1,290,000 t of ethylene, Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor est autour de la médiane des petrochemical en Malaysia (1,040,000 t of ethylene). Sous-secteur: petrochemical-steam-cracking. Comme petrochemical, elle nécessite une chaleur de procédé intensive (typiquement 300–800°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les usines pétrochimiques craquent les hydrocarbures à des températures très élevées pour produire l'éthylène, le propylène et d'autres produits chimiques de base — l'un des processus industriels les plus intensifs en chaleur.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 2,645,670 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

616,706cars driven for a year
345,027homes' annual energy use
44,094,500tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest petrochemical plants in Malaysia

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor: 1,290,000 t of ethylene1.3MPengerang …Petronas Chemicals Ethylene, Sdn. Bhd. Kertih : 1,040,000 t of ethylene1.0MPetronas C…Lotte Chemical Titan, Sdn. Bhd. Pasir Gudang, Johor : 807,000 t of ethylene807kLotte Chem…

Reported capacity (t of ethylene), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Saudi Arabian Oil Co. All facilities by this operator →

Local climate

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor sits in a tropical rainforest climate zone (Köppen Af), at 1.4°N in the northern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 3 petrochemical plants in Malaysia by reported capacity.

Nearby industrial sites

Location

Coordinates 1.37623, 104.16782. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor?

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor is a petrochemical in Malaysia. It cracks hydrocarbon feedstocks into building-block chemicals such as ethylene and propylene.

What is the capacity of Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor?

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor has a reported capacity of 1,290,000 t of ethylene.

How much CO₂ does Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor emit?

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor emits about 2,645,670 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 616,706 cars. That ranks #3 among tracked facilities in Malaysia.

Where is Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor located?

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor is in Malaysia, near coordinates 1.37623, 104.16782.

Who operates Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor?

Pengerang Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor is operated by Saudi Arabian Oil Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.