Cement Plant in Bosnia and Herzegovina. Approximate location 44.11704, 18.11278.
Cement PlantBosnia and HerzegovinaCO₂ reported
Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina with a reported capacity of 770,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Heidelberg Materials Cement BiH d.d. Kakanj. By capacity it ranks #1 of 2 cement plants tracked in Bosnia and Herzegovina. It emits about 430,400 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,326 cars. Its CO₂ per unit of capacity is about 55% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437261.
À 770,000 t of cement, Kakanj Cement Plant est autour de la médiane des cement plant en Bosnia and Herzegovina (770,000 t of cement). Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Heidelberg Materials Cement BiH d.d. Kakanj. All facilities by this operator →
Kakanj Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 2 cement plants in Bosnia and Herzegovina by reported capacity.
Coordinates 44.11704, 18.11278. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Kakanj Cement Plant has a reported capacity of 770,000 t of cement.
Kakanj Cement Plant emits about 430,400 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,326 cars. That ranks #2 among tracked facilities in Bosnia and Herzegovina.
Kakanj Cement Plant is in Bosnia and Herzegovina, near coordinates 44.11704, 18.11278.
Kakanj Cement Plant is operated by Heidelberg Materials Cement BiH d.d. Kakanj.