Home / Europe / Spain / Steel plants / Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant

Steel Plant in Spain. Approximate location 38.32042, -6.71619.

Steel PlantSpainCO₂ reported

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is a steel plant in Spain with a reported capacity of 1,300,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by AG Siderurgica Balboa SA. By capacity it ranks #5 of 14 steel plants tracked in Spain. It emits about 60,603 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,127 cars. Its CO₂ per unit of capacity is about 91% below the median steel plant.

1,300,000t of steel
60,603t CO₂e / yr (Climate TRACE)
#78CO₂ rank in Spain
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566802.

En contexte: comment cette installation se compare

À 1,300,000 t of steel, Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant est autour de la médiane des steel plant en Spain (1,200,000 t of steel). Son CO₂ par unité de capacité est approximativement 10% en dessous de la médiane des steel plant. Sous-secteur: iron-and-steel. Comme steel plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1500°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les aciéries brûlent du charbon dans des hauts fourneaux ou utilisent des arcs électriques pour fondre des ferrailles; dans les deux cas, le métal en fusion doit être maintenu au-dessus de 1.500°C et transféré à travers des tuyauteries et récipients chauds étendus.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 60,603 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

14,127cars driven for a year
7,903homes' annual energy use
1,010,050tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Spain

ArcelorMittal Asturias (Aviles) steel plant: 4,200,000 t of steel4.2MArcelorMit…Celsa Barcelona Castellbisbal steel plant: 2,500,000 t of steel2.5MCelsa Barc…ArcelorMittal Sestao steel plant: 2,000,000 t of steel2.0MArcelorMit…ArcelorMittal Olaberria-Bergara (Olaberria) steel plant: 1,450,000 t of steel1.4MArcelorMit…Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant: 1,300,000 t of steel1.3MGrupo Gall…Riva Siderurgica Sevillana steel plant: 1,300,000 t of steel1.3MRiva Sider…Acerinox Europa Los Barrios steel plant: 1,200,000 t of steel1.2MAcerinox E…ArcelorMittal Asturias (Gijón) steel plant: 1,200,000 t of steel1.2MArcelorMit…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by AG Siderurgica Balboa SA. All facilities by this operator →

Local climate

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 38.3°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 14 steel plants in Spain by reported capacity.

Nearby industrial sites

Location

Coordinates 38.32042, -6.71619. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant?

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is a steel plant in Spain. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant?

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant has a reported capacity of 1,300,000 t of steel.

How much CO₂ does Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant emit?

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant emits about 60,603 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,127 cars. That ranks #78 among tracked facilities in Spain.

Where is Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant located?

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is in Spain, near coordinates 38.32042, -6.71619.

Who operates Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant?

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is operated by AG Siderurgica Balboa SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.