Home / United States / Manufacturing plants / GM Lansing Grand River

GM Lansing Grand River

Other Manufacturing in United States. Approximate location 42.72418, -84.55554.

Other ManufacturingUnited StatesCO₂ reported

GM Lansing Grand River is an other manufacturing in United States with a reported capacity of 1 unitless. It runs heavy manufacturing processes (rubber, plastics and allied products). By capacity it ranks #290 of 338 manufacturing plants tracked in United States. It emits about 15,089 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 3,517 cars. Its CO₂ per unit of capacity is about 52% below the median other manufacturing.

1unitless
15,089t CO₂e / yr (Climate TRACE)
#1758CO₂ rank in United States
15089.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-3193219.

En contexte: comment cette installation se compare

À 1 unitless, GM Lansing Grand River est autour de la médiane des other manufacturing en United States (1 unitless). Son CO₂ par unité de capacité est approximativement 57% en dessous de la médiane des other manufacturing. Sous-secteur: other-manufacturing. Comme other manufacturing, elle nécessite une chaleur de procédé intensive (typiquement 100–600°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les installations de fabrication lourde conduisent une variété de processus intensifs en chaleur (caoutchouc, plastiques, récipients sous pression); maintenir la chaleur de procédé efficacement est critique pour la maîtrise des coûts.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 15,089 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

3,517cars driven for a year
1,968homes' annual energy use
251,483tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest manufacturing plants in United States

SABIC INNOVATIVE PLASTICS MT. VERNON, LLC: 1 unitless1SABIC INNO…Celanese Acetate LLC - Manufacturing Processes: 1 unitless1Celanese A…GOODYEAR BEAUMONT CHEMICAL PLANT: 1 unitless1GOODYEAR B…OQ CORP BAY CITY PLANT: 1 unitless1OQ CORP BA…TICONA POLYMERS INCORPORATED: 1 unitless1TICONA POL…INEOS NOVA LLC BAYPORT SITE: 1 unitless1INEOS NOVA…KRATON POLYMERS U S LLC: 1 unitless1KRATON POL…AMERICAN SYNTHETIC RUBBER: 1 unitless1AMERICAN S…

Reported capacity (unitless), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

GM Lansing Grand River sits in a warm-summer humid continental climate zone (Köppen Dfb), at 42.7°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #290 largest of 338 manufacturing plants in United States by reported capacity.

Nearby industrial sites

Location

Coordinates 42.72418, -84.55554. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is GM Lansing Grand River?

GM Lansing Grand River is a other manufacturing in United States. It runs heavy manufacturing processes (rubber, plastics and allied products).

What is the capacity of GM Lansing Grand River?

GM Lansing Grand River has a reported capacity of 1 unitless.

How much CO₂ does GM Lansing Grand River emit?

GM Lansing Grand River emits about 15,089 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 3,517 cars. That ranks #1758 among tracked facilities in United States.

Where is GM Lansing Grand River located?

GM Lansing Grand River is in United States, near coordinates 42.72418, -84.55554.

Built from open public data; no personal information. Operate this site? Request a correction or removal.