Home / South America / Brazil / Cement plants / Cimento Nacional Arcos Plant

Cimento Nacional Arcos Plant

Cement Plant in Brazil. Approximate location -20.31908, -45.57784.

Cement PlantBrazilCO₂ reported

Cimento Nacional Arcos Plant is a cement plant in Brazil with a reported capacity of 700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Companhia Nacional de Cimento - CNC Ltda. By capacity it ranks #45 of 57 cement plants tracked in Brazil. It emits about 285,259 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 66,494 cars. Its CO₂ per unit of capacity is about 13% above the median cement plant.

700,000t of cement
285,259t CO₂e / yr (Climate TRACE)
#94CO₂ rank in Brazil
0.41t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547358.

En contexte: comment cette installation se compare

À 700,000 t of cement, Cimento Nacional Arcos Plant est en dessous de la médiane des cement plant en Brazil (1,461,000 t of cement). Son CO₂ par unité de capacité est approximativement 25% au-dessus de la médiane des cement plant. Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 285,259 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

66,494cars driven for a year
37,201homes' annual energy use
4,754,317tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Companhia Nacional de Cimento - CNC Ltda. All facilities by this operator →

Local climate

Cimento Nacional Arcos Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 20.3°S in the southern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #45 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -20.31908, -45.57784. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Cimento Nacional Arcos Plant?

Cimento Nacional Arcos Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Cimento Nacional Arcos Plant?

Cimento Nacional Arcos Plant has a reported capacity of 700,000 t of cement.

How much CO₂ does Cimento Nacional Arcos Plant emit?

Cimento Nacional Arcos Plant emits about 285,259 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 66,494 cars. That ranks #94 among tracked facilities in Brazil.

Where is Cimento Nacional Arcos Plant located?

Cimento Nacional Arcos Plant is in Brazil, near coordinates -20.31908, -45.57784.

Who operates Cimento Nacional Arcos Plant?

Cimento Nacional Arcos Plant is operated by Companhia Nacional de Cimento - CNC Ltda.

Built from open public data; no personal information. Operate this site? Request a correction or removal.