Cement Plant in Albania. Approximate location 41.54885, 19.72631.
Cement PlantAlbaniaCO₂ reported
Borizane Cement Plant is a cement plant in Albania with a reported capacity of 1,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by ANTEA Cement ShA. By capacity it ranks #2 of 2 cement plants tracked in Albania. It emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437200.
À 1,400,000 t of cement, Borizane Cement Plant est en dessous de la médiane des cement plant en Albania (1,900,000 t of cement). Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by ANTEA Cement ShA. All facilities by this operator →
Borizane Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 41.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 cement plants in Albania by reported capacity.
Coordinates 41.54885, 19.72631. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Borizane Cement Plant is a cement plant in Albania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Borizane Cement Plant has a reported capacity of 1,400,000 t of cement.
Borizane Cement Plant emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. That ranks #2 among tracked facilities in Albania.
Borizane Cement Plant is in Albania, near coordinates 41.54885, 19.72631.
Borizane Cement Plant is operated by ANTEA Cement ShA.