Cement Plant in United Arab Emirates. Approximate location 25.55866, 55.98554.
Cement PlantUnited Arab EmiratesCO₂ reported
Al Banah Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 3,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge Emirates Cement Company LLC. By capacity it ranks #5 of 12 cement plants tracked in United Arab Emirates. It emits about 864,406 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 201,493 cars. Its CO₂ per unit of capacity is about 25% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895098.
À 3,200,000 t of cement, Al Banah Cement Plant est autour de la médiane des cement plant en United Arab Emirates (2,700,000 t of cement). Son CO₂ par unité de capacité est approximativement 33% en dessous de la médiane des cement plant. Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lafarge Emirates Cement Company LLC. All facilities by this operator →
Al Banah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.55866, 55.98554. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Banah Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Banah Cement Plant has a reported capacity of 3,200,000 t of cement.
Al Banah Cement Plant emits about 864,406 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 201,493 cars. That ranks #14 among tracked facilities in United Arab Emirates.
Al Banah Cement Plant is in United Arab Emirates, near coordinates 25.55866, 55.98554.
Al Banah Cement Plant is operated by Lafarge Emirates Cement Company LLC.