Steel Plant in Pakistan. Approximate location 24.84185, 67.31135.
Steel PlantPakistanCO₂ reported
Agha Steel Industries Karachi plant is a steel plant in Pakistan with a reported capacity of 450,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Agha Steel Industries Ltd. By capacity it ranks #5 of 5 steel plants tracked in Pakistan. It emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. Its CO₂ per unit of capacity is about 75% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567000.
À 450,000 t of steel, Agha Steel Industries Karachi plant est en dessous de la médiane des steel plant en Pakistan (800,000 t of steel). Son CO₂ par unité de capacité est approximativement 87% en dessous de la médiane des steel plant. Sous-secteur: iron-and-steel. Comme steel plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1500°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les aciéries brûlent du charbon dans des hauts fourneaux ou utilisent des arcs électriques pour fondre des ferrailles; dans les deux cas, le métal en fusion doit être maintenu au-dessus de 1.500°C et transféré à travers des tuyauteries et récipients chauds étendus.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Agha Steel Industries Ltd. All facilities by this operator →
Agha Steel Industries Karachi plant sits in a hot desert climate zone (Köppen BWh), at 24.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 5 steel plants in Pakistan by reported capacity.
Coordinates 24.84185, 67.31135. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Agha Steel Industries Karachi plant is a steel plant in Pakistan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Agha Steel Industries Karachi plant has a reported capacity of 450,000 t of steel.
Agha Steel Industries Karachi plant emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. That ranks #45 among tracked facilities in Pakistan.
Agha Steel Industries Karachi plant is in Pakistan, near coordinates 24.84185, 67.31135.
Agha Steel Industries Karachi plant is operated by Agha Steel Industries Ltd.