Home / Asia / United Arab Emirates / Cement plants / Union Cement Ras Al-Khaimah Plant

Union Cement Ras Al-Khaimah Plant

Cement Plant in United Arab Emirates. Approximate location 25.96746, 56.06538.

Cement PlantUnited Arab EmiratesCO₂ reported

Union Cement Ras Al-Khaimah Plant is a cement plant in United Arab Emirates with a reported capacity of 4,800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Union Cement Company PrJSC. By capacity it ranks #2 of 12 cement plants tracked in United Arab Emirates. It emits about 2,096,356 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 488,661 cars. Its CO₂ per unit of capacity is about 21% above the median cement plant.

4,800,000t of cement
2,096,356t CO₂e / yr (Climate TRACE)
#8CO₂ rank in United Arab Emirates
0.44t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895106.

En contexto: cómo se compara esta instalación

Con 4,800,000 t of cement, Union Cement Ras Al-Khaimah Plant está muy por encima de la mediana de cement plant en United Arab Emirates (2,700,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 8% por encima de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 2,096,356 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

488,661cars driven for a year
273,390homes' annual energy use
34,939,267tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in United Arab Emirates

EMSteel Industrial City Cement Plant: 5,000,000 t of cement5.0MEMSteel In…Union Cement Ras Al-Khaimah Plant: 4,800,000 t of cement4.8MUnion Ceme…Al Saajah Cement Plant: 4,270,000 t of cement4.3MAl Saajah …Gulf Cement Ras Al Khaimah Plant: 3,800,000 t of cement3.8MGulf Cemen…Al Banah Cement Plant: 3,200,000 t of cement3.2MAl Banah C…Star Cement Ras Al-Khaimah Plant: 2,700,000 t of cement2.7MStar Cemen…Fujairah Cement Plant: 2,400,000 t of cement2.4MFujairah C…JK Cement Ras Al-Khaimah Plant: 1,600,000 t of cement1.6MJK Cement …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Union Cement Company PrJSC. All facilities by this operator →

Local climate

Union Cement Ras Al-Khaimah Plant sits in a hot desert climate zone (Köppen BWh), at 26.0°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 12 cement plants in United Arab Emirates by reported capacity.

Nearby industrial sites

Location

Coordinates 25.96746, 56.06538. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Union Cement Ras Al-Khaimah Plant?

Union Cement Ras Al-Khaimah Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Union Cement Ras Al-Khaimah Plant?

Union Cement Ras Al-Khaimah Plant has a reported capacity of 4,800,000 t of cement.

How much CO₂ does Union Cement Ras Al-Khaimah Plant emit?

Union Cement Ras Al-Khaimah Plant emits about 2,096,356 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 488,661 cars. That ranks #8 among tracked facilities in United Arab Emirates.

Where is Union Cement Ras Al-Khaimah Plant located?

Union Cement Ras Al-Khaimah Plant is in United Arab Emirates, near coordinates 25.96746, 56.06538.

Who operates Union Cement Ras Al-Khaimah Plant?

Union Cement Ras Al-Khaimah Plant is operated by Union Cement Company PrJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.