Cement Plant in Poland. Approximate location 51.10966, 18.94393.
Cement PlantPolandCO₂ reported
Trebaczew Cement Plant is a cement plant in Poland with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementownia Warta SA. By capacity it ranks #4 of 10 cement plants tracked in Poland. It emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. Its CO₂ per unit of capacity is about 66% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439028.
Con 2,000,000 t of cement, Trebaczew Cement Plant está alrededor de la mediana de cement plant en Poland (2,000,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 113% por encima de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cementownia Warta SA. All facilities by this operator →
Trebaczew Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 10 cement plants in Poland by reported capacity.
Coordinates 51.10966, 18.94393. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Trebaczew Cement Plant is a cement plant in Poland. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Trebaczew Cement Plant has a reported capacity of 2,000,000 t of cement.
Trebaczew Cement Plant emits about 1,195,359 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 278,638 cars. That ranks #5 among tracked facilities in Poland.
Trebaczew Cement Plant is in Poland, near coordinates 51.10966, 18.94393.
Trebaczew Cement Plant is operated by Cementownia Warta SA.