Home / Africa / Algeria / Cement plants / Timegtane Cement Plant

Timegtane Cement Plant

Cement Plant in Algeria. Approximate location 27.25886, 1.21641.

Cement PlantAlgeriaCO₂ reported

Timegtane Cement Plant is a cement plant in Algeria with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Groupe industriel des ciments d'Algérie SpA. By capacity it ranks #10 of 16 cement plants tracked in Algeria. It emits about 391,018 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 91,146 cars. Its CO₂ per unit of capacity is about 9% above the median cement plant.

1,000,000t of cement
391,018t CO₂e / yr (Climate TRACE)
#17CO₂ rank in Algeria
0.39t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547264.

En contexto: cómo se compara esta instalación

Con 1,000,000 t of cement, Timegtane Cement Plant está alrededor de la mediana de cement plant en Algeria (1,200,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 8% por encima de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 391,018 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

91,146cars driven for a year
50,993homes' annual energy use
6,516,967tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Algeria

Hammam Dalaa Cement Plant: 5,000,000 t of cement5.0MHammam Dal…Chelf Cement Plant: 4,200,000 t of cement4.2MChelf Ceme…Oggaz Cement Plant: 3,800,000 t of cement3.8MOggaz Ceme…Ouled Adouane Cement Plant: 3,000,000 t of cement3.0MOuled Adou…Djemorah Cement Plant: 2,700,000 t of cement2.7MDjemorah C…Sigus Cement Plant: 2,000,000 t of cement2.0MSigus Ceme…Meftah Cement Plant: 1,500,000 t of cement1.5MMeftah Cem…Beni Saf Cement Plant: 1,200,000 t of cement1.2MBeni Saf C…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Groupe industriel des ciments d'Algérie SpA. All facilities by this operator →

Local climate

Timegtane Cement Plant sits in a hot desert climate zone (Köppen BWh), at 27.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #10 largest of 16 cement plants in Algeria by reported capacity.

Nearby industrial sites

Location

Coordinates 27.25886, 1.21641. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Timegtane Cement Plant?

Timegtane Cement Plant is a cement plant in Algeria. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Timegtane Cement Plant?

Timegtane Cement Plant has a reported capacity of 1,000,000 t of cement.

How much CO₂ does Timegtane Cement Plant emit?

Timegtane Cement Plant emits about 391,018 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 91,146 cars. That ranks #17 among tracked facilities in Algeria.

Where is Timegtane Cement Plant located?

Timegtane Cement Plant is in Algeria, near coordinates 27.25886, 1.21641.

Who operates Timegtane Cement Plant?

Timegtane Cement Plant is operated by Groupe industriel des ciments d'Algérie SpA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.