Cement Plant in Sudan. Approximate location 13.16967, 32.72902.
Cement PlantSudanCO₂ reported
Rabak Cement Plant is a cement plant in Sudan with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Nile Cement Co Ltd. By capacity it ranks #6 of 6 cement plants tracked in Sudan. It emits about 400,703 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 93,404 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439122.
Con 1,000,000 t of cement, Rabak Cement Plant está por debajo de la mediana de cement plant en Sudan (1,700,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 19% por encima de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Nile Cement Co Ltd. All facilities by this operator →
Rabak Cement Plant sits in a hot desert climate zone (Köppen BWh), at 13.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 cement plants in Sudan by reported capacity.
Coordinates 13.16967, 32.72902. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Rabak Cement Plant is a cement plant in Sudan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Rabak Cement Plant has a reported capacity of 1,000,000 t of cement.
Rabak Cement Plant emits about 400,703 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 93,404 cars. That ranks #5 among tracked facilities in Sudan.
Rabak Cement Plant is in Sudan, near coordinates 13.16967, 32.72902.
Rabak Cement Plant is operated by Nile Cement Co Ltd.