Home / Africa / Ethiopia / Cement plants / Messebo Cement Plant

Messebo Cement Plant

Cement Plant in Ethiopia. Approximate location 13.56927, 39.47705.

Cement PlantEthiopiaCO₂ reported

Messebo Cement Plant is a cement plant in Ethiopia with a reported capacity of 2,100,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Messebo Cement Factory PLC. By capacity it ranks #5 of 8 cement plants tracked in Ethiopia. It emits about 884,928 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 206,277 cars. Its CO₂ per unit of capacity is about 17% above the median cement plant.

2,100,000t of cement
884,928t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Ethiopia
0.42t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896749.

En contexto: cómo se compara esta instalación

Con 2,100,000 t of cement, Messebo Cement Plant está alrededor de la mediana de cement plant en Ethiopia (2,300,000 t of cement). Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 884,928 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

206,277cars driven for a year
115,405homes' annual energy use
14,748,800tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Ethiopia

Lemi Cement Plant: 5,392,562 t of cement5.4MLemi Cemen…Dangote Mugher Cement Plant: 2,500,000 t of cement2.5MDangote Mu…Derba Midroc Cement (DMC) Plant: 2,500,000 t of cement2.5MDerba Midr…Mugher Mekoda Cement Plant: 2,300,000 t of cement2.3MMugher Mek…Messebo Cement Plant: 2,100,000 t of cement2.1MMessebo Ce…Habesha Cement Plant: 1,600,000 t of cement1.6MHabesha Ce…NCSC Dire Diwa Cement Plant: 1,300,000 t of cement1.3MNCSC Dire …Ethio Chancho Cement Plant: 770,000 t of cement770kEthio Chan…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Messebo Cement Factory PLC. All facilities by this operator →

Local climate

Messebo Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 13.6°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 8 cement plants in Ethiopia by reported capacity.

Location

Coordinates 13.56927, 39.47705. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Messebo Cement Plant?

Messebo Cement Plant is a cement plant in Ethiopia. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Messebo Cement Plant?

Messebo Cement Plant has a reported capacity of 2,100,000 t of cement.

How much CO₂ does Messebo Cement Plant emit?

Messebo Cement Plant emits about 884,928 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 206,277 cars. That ranks #4 among tracked facilities in Ethiopia.

Where is Messebo Cement Plant located?

Messebo Cement Plant is in Ethiopia, near coordinates 13.56927, 39.47705.

Who operates Messebo Cement Plant?

Messebo Cement Plant is operated by Messebo Cement Factory PLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.