Cement Plant in Morocco. Approximate location 33.91045, -5.49584.
Cement PlantMoroccoCO₂ reported
Meknes Cement Plant is a cement plant in Morocco with a reported capacity of 1,750,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by LafargeHolcim Maroc SA. By capacity it ranks #4 of 14 cement plants tracked in Morocco. It emits about 904,156 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 210,759 cars. Its CO₂ per unit of capacity is about 43% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897466.
Con 1,750,000 t of cement, Meknes Cement Plant está alrededor de la mediana de cement plant en Morocco (1,600,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 64% por encima de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by LafargeHolcim Maroc SA. All facilities by this operator →
Meknes Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 14 cement plants in Morocco by reported capacity.
Coordinates 33.91045, -5.49584. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Meknes Cement Plant is a cement plant in Morocco. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Meknes Cement Plant has a reported capacity of 1,750,000 t of cement.
Meknes Cement Plant emits about 904,156 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 210,759 cars. That ranks #2 among tracked facilities in Morocco.
Meknes Cement Plant is in Morocco, near coordinates 33.91045, -5.49584.
Meknes Cement Plant is operated by LafargeHolcim Maroc SA.