Cement Plant in Bosnia and Herzegovina. Approximate location 44.52607, 18.52689.
Cement PlantBosnia and HerzegovinaCO₂ reported
Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina with a reported capacity of 700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lukavac Cement doo. By capacity it ranks #2 of 2 cement plants tracked in Bosnia and Herzegovina. It emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. Its CO₂ per unit of capacity is about 7% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437262.
Con 700,000 t of cement, Lukavac Cement Plant está alrededor de la mediana de cement plant en Bosnia and Herzegovina (770,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 40% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lukavac Cement doo. All facilities by this operator →
Lukavac Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 cement plants in Bosnia and Herzegovina by reported capacity.
Coordinates 44.52607, 18.52689. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lukavac Cement Plant is a cement plant in Bosnia and Herzegovina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lukavac Cement Plant has a reported capacity of 700,000 t of cement.
Lukavac Cement Plant emits about 233,844 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 54,509 cars. That ranks #4 among tracked facilities in Bosnia and Herzegovina.
Lukavac Cement Plant is in Bosnia and Herzegovina, near coordinates 44.52607, 18.52689.
Lukavac Cement Plant is operated by Lukavac Cement doo.