Cement Plant in Uzbekistan. Approximate location 41.40243, 71.74457.
Cement PlantUzbekistanCO₂ reported
Jahon Evro Servis Cement Plant is a cement plant in Uzbekistan with a reported capacity of 300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Jahon Evro Servis LLC. By capacity it ranks #16 of 18 cement plants tracked in Uzbekistan. It emits about 88,577 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 20,647 cars. Its CO₂ per unit of capacity is about 18% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547322.
Con 300,000 t of cement, Jahon Evro Servis Cement Plant está por debajo de la mediana de cement plant en Uzbekistan (1,400,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 25% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Jahon Evro Servis LLC. All facilities by this operator →
Jahon Evro Servis Cement Plant sits in a hot-summer Mediterranean continental climate zone (Köppen Dsa), at 41.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #16 largest of 18 cement plants in Uzbekistan by reported capacity.
Coordinates 41.40243, 71.74457. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jahon Evro Servis Cement Plant is a cement plant in Uzbekistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jahon Evro Servis Cement Plant has a reported capacity of 300,000 t of cement.
Jahon Evro Servis Cement Plant emits about 88,577 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 20,647 cars. That ranks #22 among tracked facilities in Uzbekistan.
Jahon Evro Servis Cement Plant is in Uzbekistan, near coordinates 41.40243, 71.74457.
Jahon Evro Servis Cement Plant is operated by Jahon Evro Servis LLC.