Home / Asia / Uzbekistan / Cement plants / Jahon Evro Servis Cement Plant

Jahon Evro Servis Cement Plant

Cement Plant in Uzbekistan. Approximate location 41.40243, 71.74457.

Cement PlantUzbekistanCO₂ reported

Jahon Evro Servis Cement Plant is a cement plant in Uzbekistan with a reported capacity of 300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Jahon Evro Servis LLC. By capacity it ranks #16 of 18 cement plants tracked in Uzbekistan. It emits about 88,577 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 20,647 cars. Its CO₂ per unit of capacity is about 18% below the median cement plant.

300,000t of cement
88,577t CO₂e / yr (Climate TRACE)
#22CO₂ rank in Uzbekistan
0.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547322.

En contexto: cómo se compara esta instalación

Con 300,000 t of cement, Jahon Evro Servis Cement Plant está por debajo de la mediana de cement plant en Uzbekistan (1,400,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 25% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 88,577 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

20,647cars driven for a year
11,552homes' annual energy use
1,476,283tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Uzbekistan

Qizilqumsement Cement Plant: 3,600,000 t of cement3.6MQizilqumse…Tashkent Conch Cement Plant: 2,500,000 t of cement2.5MTashkent C…Akhangaran Cement Plant: 2,500,000 t of cement2.5MAkhangaran…AWCC Andijon Cement Plant: 2,496,557 t of cement2.5MAWCC Andij…Andijan Conch Cement Plant: 2,496,557 t of cement2.5MAndijan Co…Huaxin Cement Jizzakh Cement Plant: 1,660,000 t of cement1.7MHuaxin Cem…AMMC Sherabad Cement Plant: 1,500,000 t of cement1.5MAMMC Shera…Albus Cement Plant: 1,410,114 t of cement1.4MAlbus Ceme…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Jahon Evro Servis LLC. All facilities by this operator →

Local climate

Jahon Evro Servis Cement Plant sits in a hot-summer Mediterranean continental climate zone (Köppen Dsa), at 41.4°N in the northern hemisphere.

~11°Ctypical annual mean
~24°Ctypical warm-season
Hot-summer mediterranean continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #16 largest of 18 cement plants in Uzbekistan by reported capacity.

Nearby industrial sites

Location

Coordinates 41.40243, 71.74457. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Jahon Evro Servis Cement Plant?

Jahon Evro Servis Cement Plant is a cement plant in Uzbekistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Jahon Evro Servis Cement Plant?

Jahon Evro Servis Cement Plant has a reported capacity of 300,000 t of cement.

How much CO₂ does Jahon Evro Servis Cement Plant emit?

Jahon Evro Servis Cement Plant emits about 88,577 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 20,647 cars. That ranks #22 among tracked facilities in Uzbekistan.

Where is Jahon Evro Servis Cement Plant located?

Jahon Evro Servis Cement Plant is in Uzbekistan, near coordinates 41.40243, 71.74457.

Who operates Jahon Evro Servis Cement Plant?

Jahon Evro Servis Cement Plant is operated by Jahon Evro Servis LLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.