Home / Europe / Serbia / Steel plants / HBIS GROUP Serbia Iron & Steel plant Belgrade

HBIS GROUP Serbia Iron & Steel plant Belgrade

Steel Plant in Serbia. Approximate location 44.60721, 20.96847.

Steel PlantSerbiaCO₂ reported

HBIS GROUP Serbia Iron & Steel plant Belgrade is a steel plant in Serbia with a reported capacity of 2,199,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by HBIS Group Serbia Iron & Steel Beograd doo. By capacity it ranks #1 of 2 steel plants tracked in Serbia. It emits about 2,052,057 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 478,335 cars. Its CO₂ per unit of capacity is about 73% above the median steel plant.

2,199,000t of steel
2,052,057t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Serbia
0.93t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567013.

En contexto: cómo se compara esta instalación

Con 2,199,000 t of steel, HBIS GROUP Serbia Iron & Steel plant Belgrade está alrededor de la mediana de steel plant en Serbia (2,199,000 t of steel). Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 2,052,057 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

478,335cars driven for a year
267,613homes' annual energy use
34,200,950tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Serbia

HBIS GROUP Serbia Iron & Steel plant Belgrade: 2,199,000 t of steel2.2MHBIS GROUP…Metalfer Steel Mill Sremska Mitrovica: 500,000 t of steel500kMetalfer S…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by HBIS Group Serbia Iron & Steel Beograd doo. All facilities by this operator →

Local climate

HBIS GROUP Serbia Iron & Steel plant Belgrade sits in a humid subtropical climate zone (Köppen Cfa), at 44.6°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 steel plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 44.60721, 20.96847. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade is a steel plant in Serbia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade has a reported capacity of 2,199,000 t of steel.

How much CO₂ does HBIS GROUP Serbia Iron & Steel plant Belgrade emit?

HBIS GROUP Serbia Iron & Steel plant Belgrade emits about 2,052,057 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 478,335 cars. That ranks #1 among tracked facilities in Serbia.

Where is HBIS GROUP Serbia Iron & Steel plant Belgrade located?

HBIS GROUP Serbia Iron & Steel plant Belgrade is in Serbia, near coordinates 44.60721, 20.96847.

Who operates HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade is operated by HBIS Group Serbia Iron & Steel Beograd doo.

Built from open public data; no personal information. Operate this site? Request a correction or removal.