Home / North America / Mexico / Steel plants / Grupo Simec Apizaco Cholula steel plant

Grupo Simec Apizaco Cholula steel plant

Steel Plant in Mexico. Approximate location 19.39674, -98.08818.

Steel PlantMexicoCO₂ reported

Grupo Simec Apizaco Cholula steel plant is a steel plant in Mexico with a reported capacity of 1,140,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Aceros Especiales Simec Tlaxcala SA de CV. By capacity it ranks #9 of 14 steel plants tracked in Mexico. It emits about 56,507 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,172 cars. Its CO₂ per unit of capacity is about 91% below the median steel plant.

1,140,000t of steel
56,507t CO₂e / yr (Climate TRACE)
#55CO₂ rank in Mexico
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566981.

En contexto: cómo se compara esta instalación

Con 1,140,000 t of steel, Grupo Simec Apizaco Cholula steel plant está alrededor de la mediana de steel plant en Mexico (1,330,000 t of steel). Su CO₂ por unidad de capacidad es aproximadamente 20% por debajo de la mediana de steel plant. Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 56,507 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

13,172cars driven for a year
7,369homes' annual energy use
941,783tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Mexico

ArcelorMittal Lázaro Cárdenas steel plant: 6,500,000 t of steel6.5MArcelorMit…Altos Hornos De Mexico SA AHMSA steel plant: 5,500,000 t of steel5.5MAltos Horn…Ternium Guerrero San Nicolás de los Garza steel plant: 2,400,000 t of steel2.4MTernium Gu…DEACERO Celaya steel plant: 2,300,000 t of steel2.3MDEACERO Ce…DEACERO Ramos Arizpe steel plant: 2,200,000 t of steel2.2MDEACERO Ra…TYASA steel plant: 1,650,000 t of steel1.6MTYASA stee…Ternium Puebla steel plant: 1,330,000 t of steel1.3MTernium Pu…Tenaris TAMSA Veracruz steel plant: 1,230,000 t of steel1.2MTenaris TA…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Aceros Especiales Simec Tlaxcala SA de CV. All facilities by this operator →

Local climate

Grupo Simec Apizaco Cholula steel plant sits in a subtropical highland climate zone (Köppen Cwb), at 19.4°N in the northern hemisphere.

~15°Ctypical annual mean
~20°Ctypical warm-season
Subtropical highland: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #9 largest of 14 steel plants in Mexico by reported capacity.

Nearby industrial sites

Location

Coordinates 19.39674, -98.08818. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Grupo Simec Apizaco Cholula steel plant?

Grupo Simec Apizaco Cholula steel plant is a steel plant in Mexico. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Grupo Simec Apizaco Cholula steel plant?

Grupo Simec Apizaco Cholula steel plant has a reported capacity of 1,140,000 t of steel.

How much CO₂ does Grupo Simec Apizaco Cholula steel plant emit?

Grupo Simec Apizaco Cholula steel plant emits about 56,507 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,172 cars. That ranks #55 among tracked facilities in Mexico.

Where is Grupo Simec Apizaco Cholula steel plant located?

Grupo Simec Apizaco Cholula steel plant is in Mexico, near coordinates 19.39674, -98.08818.

Who operates Grupo Simec Apizaco Cholula steel plant?

Grupo Simec Apizaco Cholula steel plant is operated by Aceros Especiales Simec Tlaxcala SA de CV.

Built from open public data; no personal information. Operate this site? Request a correction or removal.