Cement Plant in Belgium. Approximate location 50.60335, 3.49007.
Cement PlantBelgiumCO₂ reported
Gaurain Cement Plant is a cement plant in Belgium with a reported capacity of 2,300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Compagnie Des Ciments Belges SA. By capacity it ranks #1 of 4 cement plants tracked in Belgium. It emits about 823,157 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,878 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895170.
Con 2,300,000 t of cement, Gaurain Cement Plant está muy por encima de la mediana de cement plant en Belgium (1,700,000 t of cement). Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Compagnie Des Ciments Belges SA. All facilities by this operator →
Gaurain Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 4 cement plants in Belgium by reported capacity.
Coordinates 50.60335, 3.49007. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Gaurain Cement Plant is a cement plant in Belgium. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Gaurain Cement Plant has a reported capacity of 2,300,000 t of cement.
Gaurain Cement Plant emits about 823,157 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,878 cars. That ranks #7 among tracked facilities in Belgium.
Gaurain Cement Plant is in Belgium, near coordinates 50.60335, 3.49007.
Gaurain Cement Plant is operated by Compagnie Des Ciments Belges SA.