Home / Europe / Poland / Steel plants / Ferrostal Labedy Gliwice steel plant

Ferrostal Labedy Gliwice steel plant

Steel Plant in Poland. Approximate location 50.35432, 18.61081.

Steel PlantPolandCO₂ reported

Ferrostal Labedy Gliwice steel plant is a steel plant in Poland with a reported capacity of 500,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Ferrostal Labedy SP zoo. By capacity it ranks #6 of 6 steel plants tracked in Poland. It emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.

500,000t of steel
26,929t CO₂e / yr (Climate TRACE)
#149CO₂ rank in Poland
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567007.

En contexto: cómo se compara esta instalación

Con 500,000 t of steel, Ferrostal Labedy Gliwice steel plant está por debajo de la mediana de steel plant en Poland (900,000 t of steel). Su CO₂ por unidad de capacidad es aproximadamente 37% por debajo de la mediana de steel plant. Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 26,929 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

6,277cars driven for a year
3,512homes' annual energy use
448,817tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Poland

ArcelorMittal Dąbrowa Górnicza steel plant: 5,001,000 t of steel5.0MArcelorMit…CMC Zawiercie steel plant: 1,700,000 t of steel1.7MCMC Zawier…Celsa Huta Ostrowiec steel plant: 900,000 t of steel900kCelsa Huta…Huta Czestochowa steel plant: 840,000 t of steel840kHuta Czest…ArcelorMittal Warszawa steel plant: 750,000 t of steel750kArcelorMit…Ferrostal Labedy Gliwice steel plant: 500,000 t of steel500kFerrostal …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Ferrostal Labedy SP zoo. All facilities by this operator →

Local climate

Ferrostal Labedy Gliwice steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.4°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 6 steel plants in Poland by reported capacity.

Nearby industrial sites

Location

Coordinates 50.35432, 18.61081. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Ferrostal Labedy Gliwice steel plant?

Ferrostal Labedy Gliwice steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Ferrostal Labedy Gliwice steel plant?

Ferrostal Labedy Gliwice steel plant has a reported capacity of 500,000 t of steel.

How much CO₂ does Ferrostal Labedy Gliwice steel plant emit?

Ferrostal Labedy Gliwice steel plant emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. That ranks #149 among tracked facilities in Poland.

Where is Ferrostal Labedy Gliwice steel plant located?

Ferrostal Labedy Gliwice steel plant is in Poland, near coordinates 50.35432, 18.61081.

Who operates Ferrostal Labedy Gliwice steel plant?

Ferrostal Labedy Gliwice steel plant is operated by Ferrostal Labedy SP zoo.

Built from open public data; no personal information. Operate this site? Request a correction or removal.