Home / North America / Canada / Lime plants / Faulkner Plant

Faulkner Plant

Lime Plant in Canada. Approximate location 51.4135, -98.765.

Lime PlantCanadaCO₂ reported

Faulkner Plant is a lime plant in Canada with a reported capacity of 195,325 t of lime. It calcines limestone into quicklime in high-temperature kilns. By capacity it ranks #7 of 11 lime plants tracked in Canada. It emits about 109,753 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,583 cars. Its CO₂ per unit of capacity is about 15% below the median lime plant.

195,325t of lime
109,753t CO₂e / yr (Climate TRACE)
#71CO₂ rank in Canada
0.56t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38467327.

En contexto: cómo se compara esta instalación

Con 195,325 t of lime, Faulkner Plant está alrededor de la mediana de lime plant en Canada (231,971 t of lime). Subsector: lime. Como lime plant, requiere calor de proceso intenso (típicamente 600–900°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cal calcinan piedra caliza en hornos calientes a 800–900°C, y la cal viva caliente debe manejarse en recipientes aislados para prevenir reacción con la humedad.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 109,753 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

25,583cars driven for a year
14,313homes' annual energy use
1,829,217tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest lime plants in Canada

Dundas Operations: 760,888 t of lime761kDundas Ope…Usine De Bedford: 729,857 t of lime730kUsine De B…Beachville Operation: 679,628 t of lime680kBeachville…Usine De Marbleton: 327,082 t of lime327kUsine De M…Exshaw Plant: 300,230 t of lime300kExshaw Pla…Northern Lime Limited: 231,971 t of lime232kNorthern L…Faulkner Plant: 195,325 t of lime195kFaulkner P…Havelock Plant: 110,163 t of lime110kHavelock P…

Reported capacity (t of lime), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Faulkner Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 51.4°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #7 largest of 11 lime plants in Canada by reported capacity.

Nearby industrial sites

Location

Coordinates 51.4135, -98.765. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Faulkner Plant?

Faulkner Plant is a lime plant in Canada. It calcines limestone into quicklime in high-temperature kilns.

What is the capacity of Faulkner Plant?

Faulkner Plant has a reported capacity of 195,325 t of lime.

How much CO₂ does Faulkner Plant emit?

Faulkner Plant emits about 109,753 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,583 cars. That ranks #71 among tracked facilities in Canada.

Where is Faulkner Plant located?

Faulkner Plant is in Canada, near coordinates 51.4135, -98.765.

Built from open public data; no personal information. Operate this site? Request a correction or removal.