Cement Plant in Tunisia. Approximate location 35.84997, 8.59319.
Cement PlantTunisiaCO₂ reported
Djebel Ressas Cement Plant is a cement plant in Tunisia with a reported capacity of 2,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Carthage Cement SA. By capacity it ranks #1 of 7 cement plants tracked in Tunisia. It emits about 584,911 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 136,343 cars. Its CO₂ per unit of capacity is about 26% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897845.
Con 2,200,000 t of cement, Djebel Ressas Cement Plant está alrededor de la mediana de cement plant en Tunisia (1,800,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 19% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Carthage Cement SA. All facilities by this operator →
Djebel Ressas Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 35.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 7 cement plants in Tunisia by reported capacity.
Coordinates 35.84997, 8.59319. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Djebel Ressas Cement Plant is a cement plant in Tunisia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Djebel Ressas Cement Plant has a reported capacity of 2,200,000 t of cement.
Djebel Ressas Cement Plant emits about 584,911 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 136,343 cars. That ranks #3 among tracked facilities in Tunisia.
Djebel Ressas Cement Plant is in Tunisia, near coordinates 35.84997, 8.59319.
Djebel Ressas Cement Plant is operated by Carthage Cement SA.