Cement Plant in Egypt. Approximate location 29.91909, 31.53142.
Cement PlantEgyptCO₂ reported
Cairo Governorate Desert Cement Plant is a cement plant in Egypt with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Suez Cement Company SAE. By capacity it ranks #21 of 26 cement plants tracked in Egypt. It emits about 485,756 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 113,230 cars. Its CO₂ per unit of capacity is about 10% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896679.
Con 1,500,000 t of cement, Cairo Governorate Desert Cement Plant está por debajo de la mediana de cement plant en Egypt (2,690,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 10% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Suez Cement Company SAE. All facilities by this operator →
Cairo Governorate Desert Cement Plant sits in a hot desert climate zone (Köppen BWh), at 29.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #21 largest of 26 cement plants in Egypt by reported capacity.
Coordinates 29.91909, 31.53142. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Cairo Governorate Desert Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Cairo Governorate Desert Cement Plant has a reported capacity of 1,500,000 t of cement.
Cairo Governorate Desert Cement Plant emits about 485,756 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 113,230 cars. That ranks #40 among tracked facilities in Egypt.
Cairo Governorate Desert Cement Plant is in Egypt, near coordinates 29.91909, 31.53142.
Cairo Governorate Desert Cement Plant is operated by Suez Cement Company SAE.