Cement Plant in Albania. Approximate location 41.54885, 19.72631.
Cement PlantAlbaniaCO₂ reported
Borizane Cement Plant is a cement plant in Albania with a reported capacity of 1,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by ANTEA Cement ShA. By capacity it ranks #2 of 2 cement plants tracked in Albania. It emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437200.
Con 1,400,000 t of cement, Borizane Cement Plant está por debajo de la mediana de cement plant en Albania (1,900,000 t of cement). Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by ANTEA Cement ShA. All facilities by this operator →
Borizane Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 41.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 cement plants in Albania by reported capacity.
Coordinates 41.54885, 19.72631. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Borizane Cement Plant is a cement plant in Albania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Borizane Cement Plant has a reported capacity of 1,400,000 t of cement.
Borizane Cement Plant emits about 418,020 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 97,441 cars. That ranks #2 among tracked facilities in Albania.
Borizane Cement Plant is in Albania, near coordinates 41.54885, 19.72631.
Borizane Cement Plant is operated by ANTEA Cement ShA.