Cement Plant in Russian Federation. Approximate location 44.79279, 37.69437.
Cement PlantRussian FederationCO₂ reported
Atakaycement Cement Plant is a cement plant in Russian Federation with a reported capacity of 450,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Atakaycement LLC. By capacity it ranks #49 of 53 cement plants tracked in Russian Federation. It emits about 142,001 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 33,100 cars. Its CO₂ per unit of capacity is about 12% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897728.
Con 450,000 t of cement, Atakaycement Cement Plant está por debajo de la mediana de cement plant en Russian Federation (1,700,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 24% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Atakaycement LLC. All facilities by this operator →
Atakaycement Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 44.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #49 largest of 53 cement plants in Russian Federation by reported capacity.
Coordinates 44.79279, 37.69437. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Atakaycement Cement Plant is a cement plant in Russian Federation. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Atakaycement Cement Plant has a reported capacity of 450,000 t of cement.
Atakaycement Cement Plant emits about 142,001 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 33,100 cars. That ranks #158 among tracked facilities in Russian Federation.
Atakaycement Cement Plant is in Russian Federation, near coordinates 44.79279, 37.69437.
Atakaycement Cement Plant is operated by Atakaycement LLC.