Home / Türkiye / Steel plants / Asil Celik Orhangazi steel plant

Asil Celik Orhangazi steel plant

Steel Plant in Türkiye. Approximate location 40.42728, 29.27012.

Steel PlantTürkiyeCO₂ reported

Asil Celik Orhangazi steel plant is a steel plant in Türkiye with a reported capacity of 730,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Asil Celik Sanayi ve Ticaret AŞ. By capacity it ranks #25 of 26 steel plants tracked in Türkiye. It emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.

730,000t of steel
37,784t CO₂e / yr (Climate TRACE)
#93CO₂ rank in Türkiye
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567084.

En contexto: cómo se compara esta instalación

Con 730,000 t of steel, Asil Celik Orhangazi steel plant está por debajo de la mediana de steel plant en Türkiye (1,400,000 t of steel). Su CO₂ por unidad de capacidad es aproximadamente 45% por debajo de la mediana de steel plant. Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 37,784 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

8,807cars driven for a year
4,927homes' annual energy use
629,733tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Türkiye

Isdemir Payas steel plant: 5,800,000 t of steel5.8MIsdemir Pa…İÇDAŞ Biga steel plant: 5,001,000 t of steel5.0MİÇDAŞ Biga…Colakoglu Metallurgical Dilovasi plant: 4,500,000 t of steel4.5MColakoglu …Habas Aliaga steel plant: 4,500,000 t of steel4.5MHabas Alia…Toscelik Iskenderun steel plant: 4,000,000 t of steel4.0MToscelik I…Erdemir Eregli steel plant: 3,801,000 t of steel3.8MErdemir Er…Kardemir Merkez steel plant: 3,501,000 t of steel3.5MKardemir M…MMK Türkiye Metallurgical Payas plant: 2,500,000 t of steel2.5MMMK Türkiy…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Asil Celik Sanayi ve Ticaret AŞ. All facilities by this operator →

Local climate

Asil Celik Orhangazi steel plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 40.4°N in the northern hemisphere.

~14°Ctypical annual mean
~21°Ctypical warm-season
Warm-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #25 largest of 26 steel plants in Türkiye by reported capacity.

Nearby industrial sites

Location

Coordinates 40.42728, 29.27012. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant has a reported capacity of 730,000 t of steel.

How much CO₂ does Asil Celik Orhangazi steel plant emit?

Asil Celik Orhangazi steel plant emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. That ranks #93 among tracked facilities in Türkiye.

Where is Asil Celik Orhangazi steel plant located?

Asil Celik Orhangazi steel plant is in Türkiye, near coordinates 40.42728, 29.27012.

Who operates Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant is operated by Asil Celik Sanayi ve Ticaret AŞ.

Built from open public data; no personal information. Operate this site? Request a correction or removal.