Home / Asia / Saudi Arabia / Aluminium smelters / Al Jubayl Governorate

Al Jubayl Governorate

Aluminium Smelter in Saudi Arabia. Approximate location 27.07225, 49.41817.

Aluminium SmelterSaudi ArabiaCO₂ reported

Al Jubayl Governorate is an aluminium smelter in Saudi Arabia with a reported capacity of 117,418 t of alumina/aluminum. It smelts alumina into primary aluminium by high-current electrolysis. By capacity it ranks #2 of 2 aluminium smelters tracked in Saudi Arabia. It emits about 245,373 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 57,197 cars.

117,418t of alumina/aluminum
245,373t CO₂e / yr (Climate TRACE)
#48CO₂ rank in Saudi Arabia
2.09t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-3673133.

En contexto: cómo se compara esta instalación

Con 117,418 t of alumina/aluminum, Al Jubayl Governorate está por debajo de la mediana de aluminium smelter en Saudi Arabia (804,000 t of alumina/aluminum). Subsector: aluminum. Como aluminium smelter, requiere calor de proceso intenso (típicamente 600–900°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las fundiciones de aluminio utilizan grandes corrientes eléctricas para refinar alúmina en aluminio fundido por encima de 900°C, y el metal caliente debe fluir a través de crisoles y equipos de colada.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 245,373 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

57,197cars driven for a year
32,000homes' annual energy use
4,089,550tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest aluminium smelters in Saudi Arabia

Ras Al Khair aluminium plant: 804,000 t of alumina/aluminum804kRas Al Kha…Al Jubayl Governorate: 117,418 t of alumina/aluminum117kAl Jubayl …

Reported capacity (t of alumina/aluminum), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Al Jubayl Governorate sits in a hot desert climate zone (Köppen BWh), at 27.1°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 2 aluminium smelters in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 27.07225, 49.41817. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al Jubayl Governorate?

Al Jubayl Governorate is a aluminium smelter in Saudi Arabia. It smelts alumina into primary aluminium by high-current electrolysis.

What is the capacity of Al Jubayl Governorate?

Al Jubayl Governorate has a reported capacity of 117,418 t of alumina/aluminum.

How much CO₂ does Al Jubayl Governorate emit?

Al Jubayl Governorate emits about 245,373 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 57,197 cars. That ranks #48 among tracked facilities in Saudi Arabia.

Where is Al Jubayl Governorate located?

Al Jubayl Governorate is in Saudi Arabia, near coordinates 27.07225, 49.41817.

Built from open public data; no personal information. Operate this site? Request a correction or removal.