Cement Plant in Iraq. Approximate location 31.21842, 44.92608.
Cement PlantIraqCO₂ reported
Al Douh Cement Al Salman Plant is a cement plant in Iraq with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Al Douh Iraqi Company for Cement Manufacturing. By capacity it ranks #14 of 21 cement plants tracked in Iraq. It emits about 432,780 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,881 cars. Its CO₂ per unit of capacity is about 20% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547383.
Con 1,500,000 t of cement, Al Douh Cement Al Salman Plant está por debajo de la mediana de cement plant en Iraq (1,934,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 14% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Al Douh Iraqi Company for Cement Manufacturing. All facilities by this operator →
Al Douh Cement Al Salman Plant sits in a hot desert climate zone (Köppen BWh), at 31.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #14 largest of 21 cement plants in Iraq by reported capacity.
Coordinates 31.21842, 44.92608. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Douh Cement Al Salman Plant is a cement plant in Iraq. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Douh Cement Al Salman Plant has a reported capacity of 1,500,000 t of cement.
Al Douh Cement Al Salman Plant emits about 432,780 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,881 cars. That ranks #20 among tracked facilities in Iraq.
Al Douh Cement Al Salman Plant is in Iraq, near coordinates 31.21842, 44.92608.
Al Douh Cement Al Salman Plant is operated by Al Douh Iraqi Company for Cement Manufacturing.