Cement Plant in Saudi Arabia. Approximate location 20.71386, 39.82767.
Cement PlantSaudi ArabiaCO₂ reported
Tafel Cement Plant is a cement plant in Saudi Arabia with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by United Cement Industrial Co. By capacity it ranks #16 of 19 cement plants tracked in Saudi Arabia. It emits about 526,318 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 122,685 cars. Its CO₂ per unit of capacity is about 27% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897780.
Bei 2,000,000 t of cement ist Tafel Cement Plant unter dem Medianwert von cement plant in Saudi Arabia (4,000,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 24% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by United Cement Industrial Co. All facilities by this operator →
Tafel Cement Plant sits in a hot desert climate zone (Köppen BWh), at 20.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #16 largest of 19 cement plants in Saudi Arabia by reported capacity.
Coordinates 20.71386, 39.82767. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Tafel Cement Plant is a cement plant in Saudi Arabia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Tafel Cement Plant has a reported capacity of 2,000,000 t of cement.
Tafel Cement Plant emits about 526,318 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 122,685 cars. That ranks #45 among tracked facilities in Saudi Arabia.
Tafel Cement Plant is in Saudi Arabia, near coordinates 20.71386, 39.82767.
Tafel Cement Plant is operated by United Cement Industrial Co.