Home / Europe / United Kingdom / Steel plants / Se.ven GI Cardiff plant

Se.ven GI Cardiff plant

Steel Plant in United Kingdom. Approximate location 51.47217, -3.15986.

Steel PlantUnited KingdomCO₂ reported

Se.ven GI Cardiff plant is a steel plant in United Kingdom with a reported capacity of 1,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Sev.en Global Investments AS. By capacity it ranks #5 of 6 steel plants tracked in United Kingdom. It emits about 38,019 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,862 cars. Its CO₂ per unit of capacity is about 94% below the median steel plant.

1,200,000t of steel
38,019t CO₂e / yr (Climate TRACE)
#40CO₂ rank in United Kingdom
0.03t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566827.

Im Kontext: wie sich diese Anlage vergleicht

Bei 1,200,000 t of steel ist Se.ven GI Cardiff plant unter dem Medianwert von steel plant in United Kingdom (2,000,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 70% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 38,019 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

8,862cars driven for a year
4,958homes' annual energy use
633,650tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in United Kingdom

British Steel Scunthorpe plant: 3,201,000 t of steel3.2MBritish St…Tata Steel Port Talbot steel plant: 2,486,339 t of steel2.5MTata Steel…GFG Liberty Steel Newport plant: 2,000,000 t of steel2.0MGFG Libert…GFG Liberty Steel Rotherham plant: 1,220,000 t of steel1.2MGFG Libert…Se.ven GI Cardiff plant: 1,200,000 t of steel1.2MSe.ven GI …Marcegaglia Sheffield steel plant: 500,000 t of steel500kMarcegagli…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Sev.en Global Investments AS. All facilities by this operator →

Local climate

Se.ven GI Cardiff plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.5°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 6 steel plants in United Kingdom by reported capacity.

Nearby industrial sites

Location

Coordinates 51.47217, -3.15986. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Se.ven GI Cardiff plant?

Se.ven GI Cardiff plant is a steel plant in United Kingdom. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Se.ven GI Cardiff plant?

Se.ven GI Cardiff plant has a reported capacity of 1,200,000 t of steel.

How much CO₂ does Se.ven GI Cardiff plant emit?

Se.ven GI Cardiff plant emits about 38,019 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,862 cars. That ranks #40 among tracked facilities in United Kingdom.

Where is Se.ven GI Cardiff plant located?

Se.ven GI Cardiff plant is in United Kingdom, near coordinates 51.47217, -3.15986.

Who operates Se.ven GI Cardiff plant?

Se.ven GI Cardiff plant is operated by Sev.en Global Investments AS.

Built from open public data; no personal information. Operate this site? Request a correction or removal.