Cement Plant in Georgia. Approximate location 41.51446, 45.04719.
Cement PlantGeorgiaCO₂ reported
Rustavi Cement Plant is a cement plant in Georgia with a reported capacity of 400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by HeidelbergCement Georgia Ltd. By capacity it ranks #2 of 3 cement plants tracked in Georgia. It emits about 115,055 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 26,819 cars. Its CO₂ per unit of capacity is about 20% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438470.
Bei 400,000 t of cement ist Rustavi Cement Plant etwa um dem Medianwert von cement plant in Georgia (400,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 25% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by HeidelbergCement Georgia Ltd. All facilities by this operator →
Rustavi Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 3 cement plants in Georgia by reported capacity.
Coordinates 41.51446, 45.04719. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Rustavi Cement Plant is a cement plant in Georgia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Rustavi Cement Plant has a reported capacity of 400,000 t of cement.
Rustavi Cement Plant emits about 115,055 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 26,819 cars. That ranks #2 among tracked facilities in Georgia.
Rustavi Cement Plant is in Georgia, near coordinates 41.51446, 45.04719.
Rustavi Cement Plant is operated by HeidelbergCement Georgia Ltd.