Home / Europe / France / Cement plants / Port-la-nouvelle Cement Plant

Port-la-nouvelle Cement Plant

Cement Plant in France. Approximate location 43.0246, 3.02898.

Cement PlantFranceCO₂ reported

Port-la-nouvelle Cement Plant is a cement plant in France with a reported capacity of 500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge France. By capacity it ranks #16 of 22 cement plants tracked in France. It emits about 192,215 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 44,805 cars. Its CO₂ per unit of capacity is about 7% above the median cement plant.

500,000t of cement
192,215t CO₂e / yr (Climate TRACE)
#62CO₂ rank in France
0.38t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438448.

Im Kontext: wie sich diese Anlage vergleicht

Bei 500,000 t of cement ist Port-la-nouvelle Cement Plant unter dem Medianwert von cement plant in France (800,000 t of cement). Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 192,215 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

44,805cars driven for a year
25,067homes' annual energy use
3,203,583tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in France

Saint-Égrève Cement Plant: 2,900,000 t of cement2.9MSaint-Égrè…Martres Tolosane Cement Plant: 2,100,000 t of cement2.1MMartres To…Airvault Cement Plant: 2,080,000 t of cement2.1MAirvault C…Montalieu Cement Plant: 2,000,000 t of cement2.0MMontalieu …Saint Pierre La Cour Cement Plant: 1,600,000 t of cement1.6MSaint Pier…La Grave de Peille Cement Plant: 1,500,000 t of cement1.5MLa Grave d…Couvrot Cement Plant: 1,000,000 t of cement1000kCouvrot Ce…Xeuilley Cement Plant: 1,000,000 t of cement1000kXeuilley C…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Lafarge France. All facilities by this operator →

Local climate

Port-la-nouvelle Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 43.0°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #16 largest of 22 cement plants in France by reported capacity.

Nearby industrial sites

Location

Coordinates 43.0246, 3.02898. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Port-la-nouvelle Cement Plant?

Port-la-nouvelle Cement Plant is a cement plant in France. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Port-la-nouvelle Cement Plant?

Port-la-nouvelle Cement Plant has a reported capacity of 500,000 t of cement.

How much CO₂ does Port-la-nouvelle Cement Plant emit?

Port-la-nouvelle Cement Plant emits about 192,215 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 44,805 cars. That ranks #62 among tracked facilities in France.

Where is Port-la-nouvelle Cement Plant located?

Port-la-nouvelle Cement Plant is in France, near coordinates 43.0246, 3.02898.

Who operates Port-la-nouvelle Cement Plant?

Port-la-nouvelle Cement Plant is operated by Lafarge France.

Built from open public data; no personal information. Operate this site? Request a correction or removal.