Home / Russian Federation / Steel plants / Nadezhdinski Metallurgical Plant

Nadezhdinski Metallurgical Plant

Steel Plant in Russian Federation. Approximate location 59.59179, 60.59544.

Steel PlantRussian FederationCO₂ reported

Nadezhdinski Metallurgical Plant is a steel plant in Russian Federation with a reported capacity of 756,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by UMK-Stal LLC. By capacity it ranks #21 of 26 steel plants tracked in Russian Federation. It emits about 481,115 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 112,148 cars. Its CO₂ per unit of capacity is about 18% above the median steel plant.

756,000t of steel
481,115t CO₂e / yr (Climate TRACE)
#107CO₂ rank in Russian Federation
0.64t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32440956.

Im Kontext: wie sich diese Anlage vergleicht

Bei 756,000 t of steel ist Nadezhdinski Metallurgical Plant unter dem Medianwert von steel plant in Russian Federation (1,500,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 354% über dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 481,115 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

112,148cars driven for a year
62,743homes' annual energy use
8,018,583tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Russian Federation

Magnitogorsk Iron and Steel Works: 14,500,000 t of steel14.5MMagnitogor…NLMK Lipetsk steel plant: 14,400,000 t of steel14.4MNLMK Lipet…Severstal Cherepovets steel plant: 12,001,000 t of steel12.0MSeverstal …Evraz ZSMK steel plant: 9,901,000 t of steel9.9MEvraz ZSMK…Mechel Chelyabinsk Metallurgical Plant: 5,799,000 t of steel5.8MMechel Che…Evraz NTMK steel plant: 4,400,000 t of steel4.4MEvraz NTMK…Metalloinvest OEMK steel plant: 3,500,000 t of steel3.5MMetalloinv…Amurstal steel plant: 2,150,000 t of steel2.1MAmurstal s…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by UMK-Stal LLC. All facilities by this operator →

Local climate

Nadezhdinski Metallurgical Plant sits in a subarctic (boreal) climate zone (Köppen Dfc), at 59.6°N in the northern hemisphere.

~0°Ctypical annual mean
~14°Ctypical warm-season
Subarctic (boreal): long cold winters and short, cool summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #21 largest of 26 steel plants in Russian Federation by reported capacity.

Location

Coordinates 59.59179, 60.59544. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Nadezhdinski Metallurgical Plant?

Nadezhdinski Metallurgical Plant is a steel plant in Russian Federation. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Nadezhdinski Metallurgical Plant?

Nadezhdinski Metallurgical Plant has a reported capacity of 756,000 t of steel.

How much CO₂ does Nadezhdinski Metallurgical Plant emit?

Nadezhdinski Metallurgical Plant emits about 481,115 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 112,148 cars. That ranks #107 among tracked facilities in Russian Federation.

Where is Nadezhdinski Metallurgical Plant located?

Nadezhdinski Metallurgical Plant is in Russian Federation, near coordinates 59.59179, 60.59544.

Who operates Nadezhdinski Metallurgical Plant?

Nadezhdinski Metallurgical Plant is operated by UMK-Stal LLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.