Home / Asia / Mongolia / Cement plants / Moncement Senj Sant Cement Plant

Moncement Senj Sant Cement Plant

Cement Plant in Mongolia. Approximate location 44.72703, 110.7949.

Cement PlantMongoliaCO₂ reported

Moncement Senj Sant Cement Plant is a cement plant in Mongolia with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Moncement Building Materials LLC. By capacity it ranks #2 of 6 cement plants tracked in Mongolia. It emits about 426,177 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 99,342 cars. Its CO₂ per unit of capacity is about 18% above the median cement plant.

1,000,000t of cement
426,177t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Mongolia
0.43t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897526.

Im Kontext: wie sich diese Anlage vergleicht

Bei 1,000,000 t of cement ist Moncement Senj Sant Cement Plant etwa um dem Medianwert von cement plant in Mongolia (1,000,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 7% über dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 426,177 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

99,342cars driven for a year
55,579homes' annual energy use
7,102,950tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Mongolia

MAK Euro Dalanjargalan Cement Plant: 1,070,000 t of cement1.1MMAK Euro D…Moncement Senj Sant Cement Plant: 1,000,000 t of cement1000kMoncement …MAK Khukh Tsav Cement Plant: 1,000,000 t of cement1000kMAK Khukh …Munkhin Bayan Gal Cement Plant: 1,000,000 t of cement1000kMunkhin Ba…Khutul Cement & Lime Khutul Cement Plant: 500,000 t of cement500kKhutul Cem…Erel Darkhan Cement Plant: 185,000 t of cement185kErel Darkh…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Moncement Building Materials LLC. All facilities by this operator →

Local climate

Moncement Senj Sant Cement Plant sits in a cold desert climate zone (Köppen BWk), at 44.7°N in the northern hemisphere.

~11°Ctypical annual mean
~26°Ctypical warm-season
Cold desert: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 6 cement plants in Mongolia by reported capacity.

Location

Coordinates 44.72703, 110.7949. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Moncement Senj Sant Cement Plant?

Moncement Senj Sant Cement Plant is a cement plant in Mongolia. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Moncement Senj Sant Cement Plant?

Moncement Senj Sant Cement Plant has a reported capacity of 1,000,000 t of cement.

How much CO₂ does Moncement Senj Sant Cement Plant emit?

Moncement Senj Sant Cement Plant emits about 426,177 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 99,342 cars. That ranks #1 among tracked facilities in Mongolia.

Where is Moncement Senj Sant Cement Plant located?

Moncement Senj Sant Cement Plant is in Mongolia, near coordinates 44.72703, 110.7949.

Who operates Moncement Senj Sant Cement Plant?

Moncement Senj Sant Cement Plant is operated by Moncement Building Materials LLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.